Areg Energia · Est. 2020 A joint Armenian–Cyprus venture operating two utility-scale solar power plants. Areg 1 came online in 2022; Areg 2 in 2025. Together they deliver more than 12 megawatts of clean DC capacity to the grid.
Scroll ↓
01 / About

Clean energy,
built on fixed ground.

Areg Energia is a joint Armenian–Cyprus venture founded in 2020 to develop and operate utility-scale solar generation in Armenia.

Our first plant, Areg 1, was commissioned in 2022 under a Power Purchase Agreement issued by the Armenian government. In 2025, we expanded with Areg 2 — operating on a free-market license model. A further 1.1 MW DC extension is under construction.

Together, our plants supply clean electricity to the national grid while contributing to Armenia's energy independence and decarbonisation goals.

12.2MW DC
Total installed capacity
2Plants
Commissioned and operating
2020Est.
Year founded
+1.1MW DC
Extension currently under construction
02 / Plants

Two plants.
One mission.

Plant N°01

Areg 1

6.2 MW DC / 5 MW AC
Online
2022
Structure
Single-axis trackers
Off-take
PPA — Armenian government
Status
Operating
Plant N°02

Areg 2

6.0 MW DC / 6 MW AC · +1.1 MW DC under construction
Online
2025
Structure
Fixed mounting
Off-take
Free market license
Status
Operating · expansion ongoing
03 / Progress

From ground-break
to grid-connect.

June 2021

Areg 1
construction begins.

Site preparation and first foundations on the highland plateau. Single-axis tracker structures begin to take shape across the field.

Areg 1 construction site, June 2021
Areg 1 tracker foundations
Areg 1 mounting structures
1 July 2022

Areg 1 connected
to the grid.

Construction complete. Areg 1 — 6.2 MW DC of single-axis tracker arrays — begins delivering power to the Armenian national grid under PPA.

Areg 1 panorama, July 2022 — connected to the grid
1 May 2025

Areg 2
under construction.

Fixed-mount arrays going into the ground at the second plant. Working under a free-market license, Areg 2 expands the company's footprint at the site.

Areg 2 construction in progress, May 2025
1 June 2025

Areg 2 nearly
complete.

Final rows of panels going in. A further 1.1 MW DC extension is already underway, building on the 6 MW DC nameplate capacity.

Areg 2 nearing completion, June 2025
04 / Location

Built where the sun
meets the mountains.

Project Site

Southern Armenian highlands —
direct, high-altitude irradiation.

Both plants sit on the same site, chosen for its exceptional solar resource: a high-altitude plateau in southern Armenia with clear skies, low humidity, and long irradiation hours through the year.

Latitude
39°43′30.41″N
Longitude
45°39′52.14″E
Aerial view of the Areg Energia site in southern Armenia
05 / Partners

Built together.

Acba Bank
Acba Leasing
Ecoville
KfW
GAF
Huawei
Arctech
+ More